Prime and Paint all existing metal; hollow metal doors, hollow metal door frames, hollow metal windows, steel I-beams, and hand rails.

Peoria Sports Complex
read more
Prime and Paint all existing metal; hollow metal doors, hollow metal door frames, hollow metal windows, steel I-beams, and hand rails.
Inside of chamber is to be blasted and inspected before starting per spec. After inspection is completed on welds and blasting, we will stripe welds where necessary in an Industrial coating. After inspection of weld striping, and interior chamber it’s to be primed in International 670 HS. After inspection of the prime coat is completed, the top coat of International 670 HS will be applied and inspected. All coatings to be applied at DFT of 6 mils.