Kingswood Elementary School
Job Description
Exterior Weatherization, Building 1001
This project consists of exterior weatherization and painting work at Building 1001 as follows:
Surface Preparation
Power wash all surfaces prior to painting/coating.
Below-Grade Waterproofing
At areas where walls abut soil, excavate down 6″ below grade, clean, waterproof, and paint. Backfill after coating is completed.
Stucco Repair
Patch existing damaged stucco areas and texture to match existing.
Stucco & Masonry Coating
Prep surfaces, caulk cracks, spot-prime repairs, and apply two coats of elastomeric paint to stucco and masonry walls, soffits, and ceilings, including the masonry wall at the mechanical yard.
Doors
Prep and apply two coats of paint to the exterior side of hollow metal doors and door frames. Prep and paint the exterior side of one roll-up door.
Downspouts & Gutters
Prep and paint previously painted downspouts and gutters.
Metal Structures
Prep and paint steel structure at canopies. Prep and paint wrought iron fence connected to the building. Prep and paint metal gate at the mechanical yard.
