Projects

Mormon Flat Dam Project

Mormon Flat Dam Project

GO BACKJob DescriptionInside of chamber is to be blasted and inspected before starting per spec. After inspection is completed on welds and blasting, we will stripe welds where necessary in an Industrial coating. After inspection of weld striping, and interior chamber...

Morristown Elementary School

Morristown Elementary School

GO BACKJob DescriptionWhen Morristown Elementary had a brand-new playground with no funding to make it special, Riddle came to the rescue and painted a playground for all to enjoy. It was a small gesture to help a school in need.Gallery

Copper Canyon High School

Copper Canyon High School

GO BACKJob DescriptionThe exterior of building is to be first power washed using the minimum of 3,000 PSI. After power washing is complete and building has dried, we apply 3 coats of material. The first being Block Filler which fills crevices and creates a uniform...

Globe High School

Globe High School

GO BACKJob DescriptionPrevious painted or coated exterior concrete walls, stucco walls, CMU walls, concrete columns, metal canopies are to be first power washed using the minimum of 2,000 to 2,500 PSI at the flow of 4 to 14 gallons per minute per NACE Standard...

Blog Categories

Post History

September 2026
S M T W T F S
 12345
6789101112
13141516171819
20212223242526
27282930